丰山铜矿南沿深部矿体开拓提出5大类十几种方案,针对性初选3种方案从基建工程量、投资额、工期、生产运营成本、后期生产时的优缺点等各项指标进行计算、对比、分析、技术经济研究,得出最优的开拓方案。
Many development schemes were put forward for the deep ore body in the south of Fengshan Copper Mine,and three schemes were chosen for the calculation,comparison,analysis and technical and economic research from the amount of capital project,the investment cost,the time limit for a project,the production operation cost,the advantages and disadvantages in late production.The optimal development scheme was got.