摘要
三峡水库于2003年6月成功地完成了初期蓄水任务,作为其自动化技术支撑平台的三峡梯级水库调度自动化系统在实际应用中发挥了重要作用。该系统在规划、设计和建设上使用了诸多先进的技术手段,系统规模和设计水平在国内处于领先地位。
The initial impoundment of Three Gorges Reservoir was finished successfully in June 2003. Being the technical support system of the reservoir impoundment,the automatic cascade reservoir dispatching system played an important role in the actual operation. The layout,design and construction of the system keep ahead in domestic field. This article introduces the system structure and technical advantages of the automatic cascade reservoir dispatching system and its application in the initial impoundment of Three Gorges Reservoir.
出处
《水力发电》
北大核心
2003年第12期24-26,共3页
Water Power
关键词
水库调度
自动化系统
蓄水
梯级水库
三峡水库
reservoir dispatching,automation system, impoundment, cascade reservoirs, Three Gorges Reservoir