期刊文献+

开关性能不稳定的两单元温储备系统的效益分析

Cost-benefit analysis of a two-unit warm standby system with imperfect switching device
下载PDF
导出
摘要 对配备一名维修人员且开关性能不稳定的两单元温储备系统进行了效益分析。该系统中有一个单元运行级别较高(P-unit),即只要它能用,就让它运行,但当维修的时候,它与另外一个单元(O-unit)具有同样的优先级,即哪个先坏,哪个先维修。当开关失效或两个单元都失效时,系统失效。 This paper deals with the cost-benefit analysis of a single server,two-unit warm standby system with imperfect switching device.One of the unit(P-unit)in this system gains priority only for operation,that is ,whenever available,it is put into operation.However,when it fails,it has the same priority as the ohter unit(O-unit),that is to say,first come,first served.The system fails only when the switch or both of the two units fail.
出处 《西安邮电学院学报》 2004年第1期21-24,共4页 Journal of Xi'an Institute of Posts and Telecommunications
关键词 开关性能 两单元温储备 失效率 平均无故障工作时间 排队维修 warm standby failure rate mean time to system failure head-of-line
  • 相关文献

参考文献3

  • 1江荣汉编著..工程系统可靠性分析基础[M].长沙:湖南大学出版社,1987:184.
  • 2黄祥瑞.可靠性工程[M].北京:清华大学出版社,1989.118-130. 被引量:4
  • 3刘次华著..随机过程 第2版[M].武汉:华中科技大学出版社,2001:200.

共引文献3