期刊文献+

新疆乌拉泊土坝地基三向渗流计算分析和渗透稳定性评价

Three Dimensional Seepage Calculation and Seepage Stability Evaluation of Wuiapo Earth Dam Foundation in Xinjiang
下载PDF
导出
摘要 从根治乌拉泊土坝病害工程的实际出发,对强透水性坝基进行防渗措施处理。利用三向渗流数值模型,研究防渗墙和灌浆帷幕两种防渗方案及防渗墙在四种不同长度条件下渗流场地下水等势线的分布情况和渗流要素的变化规律。同时根据已有的地勘资料,对坝基及下游地层进行渗透变形分析计算,提出允许坡降,从而选择了经济可靠的垂直防渗措施的合理长度。 With a view to permanently control the dangerous wulapo earth dam,seepage prevention measures were taken for seriously permeable dam foundation treatment.By application of three dimensional seepage numerical model,cutoff wall and grout curtain were considered as seepage control alternatives,distribution of underground water iso-potential in seepage field and changing regularity of key seepage factors under four lengths of cutoff wall were studied.In light of obtained geologic prospecting data, seepage deformation in dam foundation and downstream strata were studied and calcu-lated. Allowable gradient was prosposad for economically and reliablely selecting sui-table length of vertical seepage control installations.
作者 黄俊 汪炜平
出处 《四川水力发电》 1992年第2期31-37,88,共8页 Sichuan Hydropower
关键词 土坝 渗透 变形 地基 稳定性 earth dam, seepage deformation, dangerous dam, allowable gradient, numerical model.
  • 相关文献

参考文献1

  • 1魏泽光,黄俊,许国安,李春华.三维稳定渗流的有限元计算[J]水利学报,1982(01). 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部