摘要
介绍东方锅炉(集团)股份有限公司核质保体系的背景、概貌和主要运行方式,并全面总结东锅公司在广东岭澳核电站2×1000MWe压水堆核岛主设备分包制造中的核质保实践经验和得失。
Introduces the background,outline,main implementation measures of the Nuclear quality assurance system of Dongfang Boiler,comprehensively summarizes the experience and the success and failure of Dongfang Boiler in the implementation practice of the nuclear quality assurance system for the subcontracting of the nuclear island main components of Guangdong Ling'ao Nuclear Power Station 2×1000MWe pressureized water reactors.
出处
《东方电气评论》
2003年第4期222-226,235,共6页
Dongfang Electric Review