简要介绍珠江电厂水泥码头桩基施工情况,以期总结在有潮汐影响区域的水下深层淤泥地基嵌岩钻孔灌注桩的施工方法。
For the purpose of summarizing the construction method of cast-in-situ concrete pile embeded in rock bed for underwater deep silt foundation in the areas affected by tide, construction of the pile foundation for the cement terminal of Zhujiang power plant is introduced.
出处
《水运工程》
北大核心
1992年第12期43-48,共6页
Port & Waterway Engineering