摘要
介绍为加快孟加拉国帕克西桥箱梁节段的预制进度所采取的优化措施,并对这些措施的作用和效果进行了分析和总结。
This paper highlights the optimum steps to accelerate the precasting progress of the segmental box girder of Paksey Bridge in Bangladesh, analyzes and summarizes the functions and effects of these steps as well.
出处
《世界桥梁》
2003年第4期25-28,共4页
World Bridges