摘要
通过对叶赤铁路线石脑隧道中存在的各种病害的现场考察及分析,提出了相应合理的整治原则及方案。本方案中采用新型特种材料JC-41结构修补剂和JC-12快速堵漏剂在既有铁路隧道衬砌修补加固,并根据实际情况设计施工方案、采用相应的技术措施及施工安全措施。
Appropriate and reasonable renovation principles and schemes are proposed based on the site inspection and the analysis of the existing various diseases of Ye Chi line Shi Nao railway tunnel.In the proposed scheme,we adopt new special material JC-41 Structure healant and JC-12 Fast Leak-stopping Agent to repair and strengthen the existing railway tunnel lining,design construction scheme and adopt the corresponding technical measures and construction safety measures according to the physical truth.