摘要
本文结合开滦地矿公司在开滦热电公司冷却水塔地基采空区注浆处理的成功经验, 论述了采空区注浆施工实施方法。
The paper is based on the successful experience that obtained from consolidating the foundations by grouting from surface when a cooling tower of Kailuan Power Plant was constructed by kailuan Geological and Prospecting Branch Company. The writer reheases the pratical constructing method.
出处
《河北能源职业技术学院学报》
2003年第3期55-58,共4页
Journal of Hebei Energy College of Vocation and Technology