摘要 针对上海电网调峰形式日益严峻的形势 ,对上海地区引进型 3 0 0 MW机组多年启停及运行数据、设备状况以及部分启停试验结果进行了统计整理 ,并从设备及操作的可能性、经济性和安全性角度分别进行了分析研究 ,认为引进型 3 0 0 MW机组参与电网二班制运行方式调峰的可能性是存在的 ,但部分设备及系统需作适当改进。 Aiming at the more and more severe peak-regulating situation in Shanghai power grid a statistical analysis was made for the imported 300 MW units in Shanghai region.The statistic data include startup/shutdown and operation data,the equipment condition and results of some startup/shutdown tests.The economic cost and security of the equipment operaton were also studied.The conclusion shows that the possibility of using two-shift cyclic operation of imported 300 MW units is existed,however,some of the equipments and system need to be retrofited.
作者 李颖 单洪山
出处 《华东电力》 北大核心 2003年第10期38-41,共4页 East China Electric Power
关键词 引进型300MW机组 两班制调峰 可行性分析 汽轮发电机组 电网 electricity transmission grid conflict between power supply and demand imported 300 MW unit two-shift cyclic operation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部