针对上海电网调峰形式日益严峻的形势 ,对上海地区引进型 3 0 0 MW机组多年启停及运行数据、设备状况以及部分启停试验结果进行了统计整理 ,并从设备及操作的可能性、经济性和安全性角度分别进行了分析研究 ,认为引进型 3 0 0 MW机组参与电网二班制运行方式调峰的可能性是存在的 ,但部分设备及系统需作适当改进。
Aiming at the more and more severe peak-regulating situation in Shanghai power grid a statistical analysis was made for the imported 300 MW units in Shanghai region.The statistic data include startup/shutdown and operation data,the equipment condition and results of some startup/shutdown tests.The economic cost and security of the equipment operaton were also studied.The conclusion shows that the possibility of using two-shift cyclic operation of imported 300 MW units is existed,however,some of the equipments and system need to be retrofited.
出处
《华东电力》
北大核心
2003年第10期38-41,共4页
East China Electric Power
关键词
引进型300MW机组
两班制调峰
可行性分析
汽轮发电机组
电网
electricity transmission grid
conflict between power supply and demand
imported 300 MW unit
two-shift cyclic operation