铁路隧道反坡排水技术方案及费用计算探讨 被引量:4

Technical Scheme and Cost Calculation of Reverse Slope Drainage in Railway Tunnel
下载PDF
导出
摘要 现行铁路工程隧道预算定额中洞身开挖定额包含排水量≤10 m^3/h的施工用水抽排。当排水量大于10 m^3/h时,需根据所采取治水措施及排水设计另行分析计算排水费用。此文就隧道反坡排水施工技术方案进行论述,研究新建蒙自至河口铁路石板寨一号隧道'永临相结合,分段排水'反坡排水施工方案,在此基础上分析和探讨排水量大于10 m3/h时隧道开挖增加抽排水台班费用计算方法。 The excavation quota in the current railway engineering tunnel budget quota contains the drainage of construction water with the displacement≤10 m^3/h.When the displacement of construction water is more than 10 m^3/h,the drainage cost shall be calculated according to the water control measures and drainage design.The construction technology scheme of tunnel slope drainage is expounded in this paper.The construction scheme of reverse slope drainage in No.1 tunnel of Shibanzhai of Mengzi-Hekou railway is studied.And the calculation method of additional drainage cost for tunnel excavation is analyzed when the displacement is more than 10 m^3/h.
作者 汤杰 Tang jie
出处 《铁路工程技术与经济》 2019年第5期23-27,共5页 Railway Engineering Technology and Economy
关键词 铁路隧道 反坡排水 技术方案 费用计算 Railway tunnel Reverse slope drainage Technical scheme Cost calculation
  • 相关文献

参考文献1

  • 1柴立平主编..泵选用手册[M].北京:机械工业出版社,2009:365.

同被引文献19

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部