跨南淝河斜拉桥主塔施工技术 被引量:4

Construction Technology on Main Tower of Cable-stayed Bridge Over-crossing Nanfeihe River
下载PDF
导出
摘要 为深入研究超高斜拉桥主塔的施工方法,本文以南淝河斜拉桥主塔施工为例,详细介绍了高主塔采用液压自爬模体系施工时钢筋、模板、砼以及索区钢锚梁安装的关键工艺,为类似工程施工提供参考。 To get deep into the method for constructing main tower of ultra-high cable-stayed bridge,this paper took the construction on main tower of cable-stayed bridge over-crossing Nanfeihe River as an example,gave a detailed introduction of the key technology on installation of reinforcing bar,templates,concrete and steel anchor beam during the construction of high main tower with adopting hydraulic automatic climbing formwork. It can provide a reference for similar engineering construction.
作者 李顺军
出处 《铁道建筑技术》 2015年第11期44-48,共5页 Railway Construction Technology
关键词 主塔 液压自爬模 钢锚梁 安装 main tower hydraulic automatic climbing formwork steel anchor beam installation
  • 相关文献

参考文献10

二级参考文献33

共引文献24

同被引文献32

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部