摘要 结合祁连山隧道施工实际,选取和研制了几种施工装备,并通过在高原地区长大隧道施工建设中超前预报、开挖支护、仰拱施作以及水沟电缆槽等一系列工序中的应用,从而提高了工作效率,加快了施工进度,保证了施工安全及质量。 Combined with the practical project of Qilian Mountain Tunnel,several construction equipments were selected and developed,and through a series of procedures such as advanced prediction,excavation and support,inverted arch and ditch cable groove and so on applied in the construction of long and large tunnel in plateau,the work efficiency was improved and speeded up the construction progress,thus the construction safety and quality were ensured.
作者 崔文镇
出处 《铁道建筑技术》 2015年第9期103-105 110,共4页 Railway Construction Technology
基金 青海省科技计划项目(2011-J-111A)
关键词 高原 长大隧道 装备 选取 研制 plateau long and large tunnel equipment selection development
  • 相关文献

参考文献7

二级参考文献5

  • 1中铁二局集团有限公司.高速铁路隧道工程施工技术指南[S].北京:中国铁道出版社,2010. 被引量:1
  • 2中铁一局集团有限公司.高速铁路隧道工程施工质量验收标准[S].北京:中国铁道出版社,2010. 被引量:2
  • 3万姜林,杨秀权.寺铺尖双线隧道快速施工技术措施.中国土木工程学会隧道及地下工程分会论文集,2002 被引量:1
  • 4熊成宇.双线铁路隧道快速施工技术.中国土木工程学会隧道及地下工程分会论文集,2002. 被引量:1
  • 5吴江滨.超前地质预报在隧道工程中的应用[J].工程地质学报,2003,11(2):162-168. 被引量:27

共引文献23

同被引文献44

引证文献4

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部