摘要
对于在西藏高海拔深切峡谷地区建设水电工程,面临水文气象缺少、地质环境条件多变、工程设计规模巨大、高水头超大机组容量、筑坝建设环境复杂等方面问题。中国电建集团华东勘测设计研究院有限公司投入了极大的努力,结合自身丰富的工程经验,对流域的一些独特水文、地质、水工结构、水轮发电机组、筑坝材料等,开展了一系列的研究工作,积累了大量研究成果。
For the construction of hydropower projects in the high-altitude deep gorge area of Tibet,it is facing some problemswith less hydrometeorology data,variable geological environment condition,huge engineering design scale,super large capacityhydro-generator unit with high water head and complex dam filling environment. Power China Huadong Engineering CorporationLimited has invested a great deal of effort to research the special hydrogeology,geological environment,hydraulic structure,hydro-generator unit and dam filling materials based on its abundant engineering experience in hydropower projects,and a largeamount of research results have been achieved.
作者
侯靖
吴忠
刘宁
赵国斌
李新宇
方杰
HOU Jing;WU Zhong;LIU Ning;ZHAO Guobin;LI Xinyu;FANG Jie(PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,Zhejiang,China)
出处
《水力发电》
北大核心
2019年第2期14-17,38,共5页
Water Power
关键词
高海拔深切峡谷
工程建设
高水头超大机组
筑坝技术
西藏
high-altitude deep gorge
engineering construction
super large unit with high head
dam filling technique
Tibet