摘要
本文对石佛寺水库枢纽布置进行了多方案的选择,其枢纽布置的关键是泄洪闸及泄水洞位置布设,文中根据两个方案的比较,决定采用方案1,将闸位布置在拦河主坝右端的主河道处,泄洪洞设在泄洪闸左端,又通过对支流改建、交叉建筑物改建工程设计最终确定了石佛寺水库枢纽布置工程。
In the paper,many plans of Shifosi Reservoir hub layout are selected. The hub layout has the key point of arranging sluice gates and discharge tunnels. In the paper,plan 1 will be adopted according to comparison of two plans.The gate is arranged on the main river channel,which is on the right of river blocking main dam. The discharge tunnel is set on the left of the sluice gate. Shifosi Reservoir hug layout project is finally determined through project design of tributary renovation and crossed building renovation.