摘要
修井作业在某些非理想工态下,打水泥塞难度较大,且具有一定的风险,本文通过对尕斯库勒油田一些井位打水泥塞的失败分析,找出失败原因。
During some unideal condition, cementing plug is hard and has great risk.rtain risk, Based on the analysis of some well cementing plug failure in Qaidam Basin,the reasons of failure was analyzed.
出处
《石化技术》
CAS
2015年第2期195-196,共2页
Petrochemical Industry Technology
关键词
水泥塞
失败分析
原因
cement plug
failure analysis
reason