动臂式塔式起重机是超高层建筑施工过程中重要的垂直运输工具,但在施工过程中,外挂形式动臂塔的外挂支架倒运时间过长,对施工周期工期影响较大。通过技术优化,解决了这一难题。
Boom type tower crane is an important vertical transportation tool in the process of the construction of high-rise buildings,but in the construction process,reverse transportation time has great influence on construction period.Through technical optimization,this problem was solved.