两河口水电站大坝砾石土心墙雨季快速施工技术 被引量:1

Rapid Construction Technology of Gravel Clay Core in Rainy Season of Dam for Lianghekou Hydropower Station
下载PDF
导出
摘要 频繁降雨对砾石土心墙施工造成不利影响,主要介绍了两河口水电站大坝砾石土心墙雨季快速施工技术,通过采取精准降雨预报,以及坝面快速施工相关技术,在确保工程质量的前提下,提高了施工效率,加快了施工进度,并节省了投资,取得了较好效益。 Frequent rainfall adversely affects the construction of gravel clay core wall in rock-fill dam of the Lianghekou hydropower station. In order to reduce this impact,rapid construction technology of gravel clay core in the rainy season were adopted,including accurate rainfall forecasting and rapid construction technology for filling surfaces. By adopting these measures,the results show that while the project quality meets the requirements,the construction efficiency is improved,the construction progress is accelerated,and the investment is reduced.
作者 杨希
出处 《施工技术》 CAS 2018年第S1期1043-1046,共4页 Construction Technology
关键词 砾石土心墙 雨季 快速 施工技术 gravel clay core rainy season rapidity construction
  • 相关文献

参考文献1

  • 1姚福海,杨兴国主编..瀑布沟砾石土心墙堆石坝关键技术[M].北京:中国水利水电出版社,2015:301.

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部