深水双壁钢围堰混凝土封底透水涌砂处理新技术 被引量:3

The New Technology of Water Surge Sand Treatment in the Concrete Bottom of Double Wall Steel Cofferdam in Deep Water
下载PDF
导出
摘要 以某桥深水双壁钢套箱围堰混凝土封底透水涌砂事故为例,介绍了事故形成的经过,提出了围堰外侧双排高压旋喷桩防渗墙和内侧混凝土封底底板下部注浆相结合的处理新技术,阐述了处理实施的工艺和要点。工程实施效果表明,可为以后同类混凝土封底的事故处理提供借鉴参考。 Based on the deep water double-wall steel boxed cofferdam of a bridge concrete permeable sand chung accident as an example,this paper introduces the accident after forming,puts forward the high pressure jet grouting pile cofferdam lateral double row cut-off and the lower part of the inside bottom grouting combined processing technology,this paper expounds the process and key points on the implementation of processing. The result of the project shows that it can provide reference for the accident treatment of similar concrete sealing in the future.
出处 《施工技术》 CAS 2018年第S1期125-127,共3页 Construction Technology
关键词 桥梁工程 双壁钢套箱围堰 混凝土封底 透水涌砂 高压旋喷桩防渗墙 注浆 bridges double wall steel casing cofferdam concrete back cover permeable and Sand gushing anti-seepage wall of high-pressure whirling piles grouting
  • 相关文献

参考文献5

二级参考文献20

共引文献14

同被引文献14

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部