大型电缆沟预制及安装施工技术 被引量:8

The Precasting and Hoisting Technology of Large-sized Cable Trench
下载PDF
导出
摘要 核电厂施工具有工期紧、作业面小、同时施工项目多、安全文明施工要求严等特点。电缆沟作为电厂不可或缺的组成部分,其施工贯穿整个核电厂建设期,与厂房施工存在可能的交叉作业,交叉作业在施工中带来严重的安全隐患,同时制约厂房的施工进度。因此,如何解决厂房施工与电缆沟施工交叉作业和电缆沟施工制约厂房施工进度等问题,预制电缆沟道为我们提供了一种有效、可行的解决方案。 Nuclear power plant construction has the characteristics of tight schedule,narrow working space but multiple projects at the same tims,high standards of safe and civilized construction. As an indispensable part of the power plant,the cable trench construction throughout the whole project construction cycle and problem come with this situation is cross construction. But,cross construction would cause serious security risks and delay of the whole construction. So,how to sovle these problems is of great significance and the precasting of cable trench provided us an effective and workable solution.
出处 《施工技术》 CAS 北大核心 2017年第S2期1261-1264,共4页 Construction Technology
关键词 核电站 沟道预制 沟道吊装 nuclear power plant precasting technology hoisting technology
  • 相关文献

同被引文献69

引证文献8

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部