田湾核电站3,4号机组BOP子项50多个,大体上每个厂房都配备不同形式、规格的通风机来满足房间内操作、运行环境需求。通风机的单体调试就是检验风机安装质量的最好办法,因此通风机单调完美结束对核电发电具有举足轻重的作用。简单介绍田湾核电站BOP子项各主要类型通风机单体调试流程、方法及安全管理措施,为后续民用建筑、工业建筑风机安装、调试提供宝贵经验。
There are more than 50 BOP subitems in the tianwan nuclear power plant. In general,each plant is equipped with a different form of ventilation fan to meet the operating environment needs in the room. The unit debugging of ventilator is the best way to test the installation quality of the fan. Therefore,the monotonous and perfect ending of the ventilator is of great importance to nuclear power generation. This paper briefly introduces the method and safety management measures of the main types of the main types of the BOP sub-item in the tian wan nuclear power plant,and provides valuable experience for the installation and commissioning of the construction fan of the subsequent civil construction industry.
出处
《施工技术》
CAS
北大核心
2017年第S2期772-774,共3页
Construction Technology
关键词
核电
BOP
风机
调试
nuclear power
BOP
fan