摘要
本文介绍了温州瓯江南口大桥30m现浇箱梁一跨式双层贝雷梁施工工艺,着重介绍了双层贝雷梁整体下放、整体横移以及整体提升施工工艺,可供类似工程施工参考。
This paper introduced the techniques of 30 m cast-in-situ concrete box girder of Oujiang Nan Kou bridge built by one-span double-storey Bailey beam,especially the construction techniques of overall lowering,horizontal traveling and lifting. The conclusions offer references for similar engineering.
出处
《施工技术》
CAS
北大核心
2017年第S1期1014-1016,共3页
Construction Technology
关键词
桥梁工程
现浇箱梁
贝雷梁
施工工艺
bridges
cast-in-situ concrete box girder
Bailey beam
construction techniques