滨海东大道2号桥为9孔V形刚构连拱桥,同时为规划港区景观工程,桥梁结构复杂,地形、地质等施工条件较差,施工难度较大。依托承建工程介绍工程主要特点,阐述施工中关键技术问题的解决方法,确保施工的安全可靠及桥梁内在质量及线形满足设计要求。
Binhai East Road No. 2 bridge is the 9-hole V-shaped rigid frame bridge multiple arch bridge,? at the same time,it is difficult to construct for the port area landscape engineering. The bridge structure is complex,and the topography and geology are poor. This paper introduces the main features of the construction project,described a method to solve the key technical problems in construction,which can ensure the construction safety and quality of bridge alignment and meet the design requirements.
出处
《施工技术》
CAS
北大核心
2017年第S1期995-998,共4页
Construction Technology
关键词
桥梁工程
刚构连拱桥
超静定结构
施工技术
bridges
rigid frame arch bridge
statically indeterminate structure
construction