期刊文献+

混凝土浆气池后张无粘结预应力技术 被引量:1

Application of Post-tensioned Unbonded Prestressed Technique in Concrete Slop-gas Pool
下载PDF
导出
摘要 山东省兖州市污水处理工程是国家实施淮河流域治污、南水北调战略东线工程的重要组成部分 ,采用吸附 生物氧化二级处理法。其污泥消化池内含混合泥浆沼气 ,侧压力大 ,构筑物整体采用后张无粘结预应力技术 。 In the project of pollution control in Huaihe valley and the eastern line of trans ferring water from south to north strategy, the sewage disposal item in Yanzhou city is an important portion.In this item,we adpoted the absorption and secondary bio oxigenation technique.Methane is produced during the mud dispose process,which would exert high side pressure to the pool.In the construction of the pool,the integral post tensioned prestressed technique is used to cut down the expense.This experience is a good exploration in the improvement of this technique.
作者 陈方庆
出处 《建筑结构》 CSCD 北大核心 2003年第8期33-35,共3页 Building Structure
关键词 混凝土浆气池 后张 无粘结预应力 南水北调工程 工程成本 钢绞线 屈服强度 post tensioned unbonded tendon standard value yield strength
  • 相关文献

参考文献5

  • 1陶学康编著..无粘结预应力混凝土设计与施工[M].北京:地震出版社,1993:261.
  • 2林太珍等主编..高效预应力混凝土工程实践[M].北京:中国建筑工业出版社,1993:412.
  • 3.(JGJ/T92—93).无粘结预应力混凝土结构技术规程[S].,1993.. 被引量:1
  • 4ACI Committee 318. Building Code Requirements for Reinforced Concrete(ACI318--95), American Concrete Institute, 1995. 被引量:1
  • 5ACI Committee 423. Recommendations gor Concrete Members Prestressed with Unbonded Tendons ( ACI423. 3R--96 ). American Concrete Institute, 1996. 被引量:1

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部