7Khanzadi M, Nasirzadeh F, Alipour M. Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects [ J ]. Automation in Construction, 2012, (22) :368-376. 被引量:1
10Margaret F. Shipley.BIFPET method analogy versus PERT in project management: Fuzzy Probability Instead of the Beta Distribution [J].Techno Manage, 1997, 14: 49-65. 被引量:1