13层框剪结构楼房部分爆破拆除

PARTIAL DEMOLITION OF A 13-STOREYED FRAME-SHEAR BUILDING BY BLASTING
下载PDF
导出
摘要 介绍了13层、高45m的框剪结构楼房部分爆破拆除,其结构和环境复杂。采用了爆破缺口高度差、多段微差爆破时间差相结合的定向倾倒措施,通过试验炮,选择了合理的爆破参数,进行了有效的预处理及防护,使楼房爆破时倾倒方向、触地后的翻转、飞石、地震波等都得到了有效控制。对楼房爆破及倾倒触地产生的震动进行了监测、分析。爆破很成功。 A 13storeyed frameshear building with a height of 45m in complex surroundings was partially demolished by directional blasting with combination of different cut heights with various delay intervalsThrough selecting reasonable blasting parameters on base of testing blasts,effective pretreatment and protecting measures,collapsing direction and turnover of the building,flying rocks and seismic wave were effectively controlledThe ground vibrations resulted from blasting and touchdown of the building were monitored and the monitoring results were analyzedIn a word,the demolition blasting is successful
出处 《矿冶》 CAS 2003年第2期18-21,13,共5页 Mining And Metallurgy
关键词 框剪结构楼房 部分拆除爆破 爆破环境 爆破缺口高度差 爆破时间差 爆破方案 爆破安全距离 爆破参数 Frame-shear structure Demolition blasting Vibration monitoring Pretreatment
  • 相关文献

参考文献2

二级参考文献1

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部