鹰嘴岩隧道软弱破碎岩体的开挖与施工 被引量:23

Excavation and construction of soft and crushed rock mass in the Yingzuiyan Tunnel
下载PDF
导出
摘要 渫水皂市水利枢纽左岸上坝公路鹰嘴岩隧道围岩主要为Ⅱ、Ⅲ、Ⅳ、Ⅴ类围岩,地质条件复杂,成洞条件差。在隧道施工中,遵循"短进尺,弱爆破、少扰动、早支护"的原则,及时进行监控量测,采取有效的加固措施,取得了良好效果,确保了工程进度与安全。 The surrounding rocks of the Yingzuiyan Tunnel of the access road on the left bank of the Dieshui City Water Control Project mainly consists of the classII, III, IV and V rocks which have complex geological conditions and bad tunnelforming conditions. In the construction of the tunnel, we followed the principle 'short feeding, weak blasting, less disturbing and early support', made timely supervision and measurement and adopted effective fastening measures so that better results were obtained and the progress and safety of the project were ensured.
作者 王军辉
出处 《水力发电》 北大核心 2003年第5期67-68,共2页 Water Power
关键词 渫水皂市 开挖 施工 公路隧道 围岩 软弱破碎岩体 tunnel, soft and crushed rock mass, excavation, construction, Dieshui City Water Control Project
  • 相关文献

同被引文献50

引证文献23

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部