总结了渤海绥中 36 - 1Ⅱ期工程井口平台标准化设计的实践。该项工程通过标准化设计 ,缩短了设计和建造工期 ,节约了材料采办成本 ,降低了工程费用 ,为今后类似工程项目进一步推行海洋平台标准化设计提供了借鉴。
This paper summarizes the standardized design of the wellhead of Bohai SZ 36-1 oilfield phase II project. In this practice, the period of design and construction was cut down, and the cost of the project was reduced. It is useful for further promoting the application of the standardization method for the offshore platform design.