摘要
对原29MW热水锅炉进行优化改造设计,改进性能,降低成本,并满足其锅炉房空间有限,基础荷载小的现有条件。
HBC does his possible to optimize the primary 29 MW hot-water boiler version aim at promoting property, reducing cost and fitting the limited spare, little base load boiler room of HPEC
出处
《锅炉制造》
2003年第2期60-62,共3页
Boiler Manufacturing