摘要
根据电厂提供的试验数据 ,对华能石洞口第二电厂 2号机组的再热器系统的超温原因进行分析 ,并提出改造方案 ,以确保电厂长期安全稳定地运行。
This paper discusses the causes of the overheating problem existed in the reheating system of Huaneng Shidongkou Second Power Plant on the basis of the experimental data supplied by the power plant.To ensure the longterm safe operation of the power plant,the countermeasures against possible overheating of the reheating system are also given in this paper.
出处
《上海工程技术大学学报》
CAS
2002年第2期88-91,共4页
Journal of Shanghai University of Engineering Science
关键词
再热器
超温
热偏差
Reheater
Overheating
Thermal deviation