期刊文献+

快速干道路基排水测试方案研究 被引量:1

Study on the Flow Monitoring System of Express Way Subgrade Drainage
下载PDF
导出
摘要 在上海市外环线(浦东段)二期工程中,突破了传统的道路排水设计,设置了综合排水试验段,建立了自动化的综合排水测试系统,实现了数据自动采集并通过电话拨号上网进行远程传送。着重论述了路基排水测试系统的水力学设计。 During the second stage of urban outer-ring road project(Pudong section),the tradi-tional design of road drainage was reviewed and a synthetic drainage system was set up for exper-iment.A series of automatic test instruments that monitor synthetic drainage working was installed on the spot,and data were automatically gathered and telecommunicated online by dial.This paper mainly discusses the hydraulic design of the flow monitoring of subgrade drainage.
出处 《苏州科技学院学报(工程技术版)》 CAS 2003年第2期43-48,共6页 Journal of Suzhou University of Science and Technology (Engineering and Technology)
基金 上海市科委科技攻关项目
关键词 道路工程 室外排水 现场测试 盲沟系统 水力学 快速干道 路基排水测试系统 road engineer outdoor drainage field test blind-drainage system hydraulics
  • 相关文献

参考文献2

二级参考文献3

  • 1城市道路设计规范(CJJ37—90),1997年 被引量:1
  • 2公路排水设计规范(JTJ018—97),1998年 被引量:1
  • 3室外排水工程规范(GBJ14-87),1998年 被引量:1

共引文献6

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部