介绍了浙江半山天然气发电工程采用三套 35 0MW级燃气 蒸汽联合循环发电机组 ,每套机组有四大主机 :燃气轮机 (GT)、余热锅炉 (HRSG)、汽轮机 (ST)及发电机 (G)。由于气价较高 ,确定采用F级燃机及相应的余热锅炉与汽轮机 ;对主机配置进行比选 ,确定每套机组由一台F级燃机、一台余热锅炉、一台汽轮机组成单轴系统 (燃机、汽轮机与发电机同轴 )。
Three-350 MW power generation units by using gas-steam combined cycle will be established in Zhejiang Banshan Natural Gas Fired Power Plant. Each unit consists of GT, HRSG, ST and G. GT is the key main machine. F type GT is selected because of the relative higher natural gas cost. Also, the following main machine arrangement is selected: 1 F type GT+1 HRSG+1 ST (GT. ST and G use the same single axis).