本文就通辽发电总厂4台200MW机组高压主汽门预启阀卡涩的原因进行了详细的分析,并提出了具体的改进措施,为确保机组安全、稳定运行,提供了可靠依据.
In this paper, Tongliao power plant 4 sets of 200MW unit high pressure main stop valve pre opening and cause valve jam has carried on the detailed analysis, and put forward specific improvement measures, to ensure crew safety, stable operation, reliable basis is provided.