摘要
大伙房水库输水工程干线与各配水厂控制系统衔接是保证供水安全、调度高效的必然要求。本文重点介绍了三类接入方案的结构特点,并分别进行了对比研究,对控制系统接入方案的选择有一定指导意义。
Dahuofang Reservoir Water Diversion Project main line is connected with control systems of all water distribution plants in order to ensure necessary requirements on water supply safety and efficient dispatching. In the paper,structure features of three kinds of access plans are mainly introduced,which are comparatively studied in several aspects. The paper has certain guidance significance for selecting control system access plans.
出处
《中国水能及电气化》
2015年第5期38-41,共4页
China Water Power & Electrification
关键词
供水调度
PLC通信
网关
OPC
water supply schedue
PLC communication
gateway
OPC