摘要
文中介绍了有公共交货期的并行多机提前/拖后调度问题的数学模型,基于该模型提出了机器数和模具数发生变化后进行快速分析和重新调度的方法,而且有效的利用了人工智能的启发功能,并成功的结合了SA和GA。
On the basis of introducing an identical parallel machine E/T scheduling problem, a re-scheduling function is developed for disturbance of the number of the machine and mould. Simulation of test problem shows that the GA/SA with heuristic rules is more efficient than genetic algorithm.
出处
《微计算机信息》
2003年第5期66-67,共2页
Control & Automation