摘要
建设单位有效控制工程造价的几个要素。从项目投资阶段、设计阶段、招标投标阶段、施工阶段等四个阶段怎样对工程造价控制进行了阐述,是建设单位节约经费、提高经济效益的有效措施和手段。
The auther explains how the construction unit can take effective measures to control the construction costs from the following four stages-the item investment, the item design, the inviting bid and entering bid,and the construction.That is the way for the construction unit to reduce expenses and increase economic efficiency.
出处
《鸡西大学学报(综合版)》
2003年第1期76-76,78,共2页
JOurnal of Jixi University:comprehensive Edition