深井大断面交岔点变形机理及稳定性控制研究 被引量:8

Study on Deformation Mechanism and Stability Control of Large Cross Section Intersection in Deep Mine
下载PDF
导出
摘要 为解决夹河煤矿深部大断面3号交岔点难以支护的问题,分析可知3号交岔点变形破坏的主要原因是高地应力、开挖扰动以及支护体和围岩强度与结构的不耦合,据此提出了锚网喷+锚索+底角锚杆+中间岩柱双控锚索的耦合支护技术,现场应用表明:采用锚网索耦合支护技术后3号交岔点顶底板最大移近量为69 mm,两帮最大移近量为45 mm,3号交岔点变形得到了有效控制。 In order to solve the difficult support problem of No. 3 intersection of deep large cross section in Jiahe Mine,the paper analyzed the major causes of the deformation failure in No. 3 intersection were the high ground stress,mining and excavation turbulence and the uncoupling between the surrounding rock strength and structure.A coupling support technology of bolt/steel mesh/shotcreting+anchor+floor corner bolt+double control anchor in middle rock pillar was provided.The site application showed that after the coupling support applied, a max roof and floor convergence of No. 3 intersection was 69 mm,a max convergence of the two sidewalls was 45 mm and the deformation of No. 3 intersection was effectively controlled.
出处 《煤炭科学技术》 CAS 北大核心 2014年第5期13-16,共4页 Coal Science and Technology
基金 国家自然科学基金面上基金资助项目(51374214) 国家自然科学基金资助项目(51304210) 中央高校基本科研业务费专项资金资助项目(2011QL07)
关键词 深部矿井 大断面交岔点 变形机理 耦合支护 围岩稳定性 deep mine large cross section intersection deformation mechanism coupling support surrounding rock stability
  • 相关文献

参考文献16

二级参考文献182

共引文献2330

同被引文献57

引证文献8

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部