期刊文献+

深井沿空掘巷护巷煤柱相似模拟实验研究 被引量:4

Experimental Study on Similar Simulation of Coal Pillar along Hollow Excavation Roadway in Deep Well
下载PDF
导出
摘要 针对潞安集团余吾煤业S2106工作面沿空护巷煤柱,其注浆前后的效果对巷道围岩稳定性的影响,采用相似模拟原理和方法,对注浆前后的煤柱进行相似模拟研究。通过对煤柱的整体形态及巷道围岩稳定性等特征对比分析,实验表明,注浆加固后的煤柱对巷道围岩变形控制效果明显,能够满足工作面回采要求。 In view of the effect of the grouting effect on the stability of roadway surrounding rock in the S2106 working face of the Yuwu coal mining group before and after grouting along the coal pillar of the hollow retaining roadway,the similarity simulation of coal pillar before and after grouting was carried out by using similarity simulation principle and method.Through the comparison and analysis the overall shape of coal pillar and the stability of roadway surrounding rock and other characteristics before and after grouting reinforcement,the coal pillar strengthened by grouting has obvious effect on controlling the deformation of roadway surrounding rock and can meet the requirement of working face mining.
作者 孙淼 孙泽东 SUN Miao;SUN Ze-dong(Yuwu Coal Mine,Lu′an Group,Changzhi046103,China;Institute of Mining Technology,Taiyuan University ofTechnology,Taiyuan030024,China;Baidong Coal Mine,Datong Group,Datong037029,China)
出处 《煤炭技术》 CAS 2019年第8期24-26,共3页 Coal Technology
关键词 相似模拟 沿空护巷煤柱 注浆加固 围岩变形 analog simulation pillar along hollow guard lane grouting reinforcement deformation of surrounding rock
  • 相关文献

参考文献7

二级参考文献27

共引文献261

同被引文献38

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部