摘要
结合老虎台矿的68002#掘进工作面具有局部冲击地压危险性,实施了煤体高压注水技术措施,并进行了效果考察分析,有效地降低了掘进工作面的冲击地压危险性。
Combining the Laohutai coal mine 68002#tunneling working surface has the burst risk of local impact.The implementation of the technical measures of coal of high pressure water injection and the effects were analyzed and effectivly reduces the tunneling working surface of rock burst risk.
出处
《煤炭技术》
CAS
北大核心
2014年第8期100-102,共3页
Coal Technology
关键词
煤体高压注水
钻屑量法
考察
电磁脉冲数
注水有效半径
high pressure water injection in coal body
drilling cuttings weight method
inspect
electromagnetic pulse number
injection radius