摘要
武都水库为碾压混凝土高坝,其坝基下岩体的变形、混凝土和岩体及岩体自身抗剪强度直接关系到坝体的安全。通过大量的试验研究,为地质和设计提供了可靠的力学参数。
A high roller compacted concrete dam is located at Wudu Reservoir . Dam safety is directly depended on rock deformation under dam foundation , shear strength of concrete and rock contact , shear strength of rock . A number of experiment studies are carried out to provide reliable mechanical parameters for geologic analysis and design .
出处
《四川水力发电》
2003年第2期45-46,共2页
Sichuan Hydropower