介绍了引黄工程联接段施工公路1#桥的工程概况以及预应力混凝土空心板施工条件,分析了部分桥面梁板产生裂缝的原因。
This paper introduces the engineering situation of 1#Construction Highway Bridge in the connecting section of Yellow River Diversion Project, expounds the construction conditions of prefabricated concrete hollow slabs, and analyses on the causes of some bridge beam-slabs.
出处
《科技情报开发与经济》
2003年第5期102-103,共2页
Sci-Tech Information Development & Economy