摘要
文章对渝怀铁路第二长隧道———武隆隧道出口正洞穿越制药厂楼房桩基段的隧道综合施工技术进行了阐述 ,重点论述了双层大管棚托换、控制爆破等技术措施 。
Wulong Tunnel is the second longest one on Yuhuai Railway. The comprehensive construction technique of its entrance through the pile foundation of Medicine-made building is discussed. Particularly, the technique such as underpinning by double-layer pipe roof, controlled blasting and so on, are expounded. The measures for pile body intruding into the tunnel are introduced.
出处
《现代隧道技术》
EI
2003年第1期54-58,64,共6页
Modern Tunnelling Technology