摘要
在常门铺水库溢洪道改造中,通过水工模型试验,对其数据成果进行分析并进行方案比较,最终采用既经济又合理的方案二,为国家节省投资50.8万元。
For the transform project of spillway of Changmenpu Reservoir, through the comparison of design scheme by hydraulic model test, the second design scheme is considered as an economical rational design scheme, and adopted.508 thousand Yuan investment will be saved.
出处
《山西水利科技》
2003年第1期42-43,共2页
Shanxi Hydrotechnics