摘要
对汾河二库工程碾压混凝土仓面施工与控制的有关问题,包括混凝土运输入仓、碾压混凝土摊铺、混凝土碾压、Vc值仓面控制、变态与常态混凝土施工、层面处理与控制等进行了分析和探讨。
This paper analyses on and probes into some main control measures for problems relative to rolled concrete storehouse surface construction and control of the engineering of No.2 Fenhe Reservoir, including transporting of the concrete into the storehouse, spreading of rolled concrete, rolling of the concrete, controlling of Vs on storehouse surface, constructing of abnormal and normal concrete, treating and controlling of storehouse surface, etc.
出处
《科技情报开发与经济》
2003年第4期209-210,共2页
Sci-Tech Information Development & Economy
关键词
仓面施工
碾压混凝土
混凝土施工
水利工程
rolled concrete
controlling of storehouse surface
construction of concrete