混凝土斜拉桥采用前支点挂篮悬臂浇注施工的中间索力确定方法 被引量:14

Determination of the Interim Cable Forces of Cable-stayed Bridges with Concrete Girders during the Cantilever Cast-place Construction Using Form Travelers with Fore-fulcra
下载PDF
导出
摘要 根据前支点挂篮的受力要求和混凝土主梁的受力情况综合确定混凝土斜拉桥的中间索力 ,即先根据前支点挂篮的受力要求确定混凝土斜拉桥中间张拉索力的允许范围 (即上下限 ) ,再利用上下限的平均值代入正装计算过程中进行计算 ,并根据混凝土主梁的受力情况在上下限范围内对中间索力作适当的调整 。 The interim cable forces of cable?stayed bridges with concrete girders are determined on the basis of the actual conditions to which form travelers with fore?fulcra and the concrete girders are exposed The allowable scope (viz upper limits and lower limits) of the interim cable forces of cable?stayed bridges is determined on the basis of the actual conditions to which form travelers with fore?fulcra are exposed at first, and then the calculations are started according to the averages of the upper limits and lower limits and the interim cable forces used to adjust among the upper limits and the lower limits depending on the actual conditions to which concrete girders are exposed until the results are satisfactory
出处 《公路交通科技》 CAS CSCD 北大核心 2002年第5期77-79,共3页 Journal of Highway and Transportation Research and Development
基金 国家教育部2000年高等学校骨干教师资助计划项目(特大跨度混凝土斜拉桥的设计状态确定与施工控制关键技术研究)
关键词 斜拉桥 前支点挂篮 中间索力 悬臂现浇施工 Cable-stayed bridges Form travelers with fore-fulcra The interim cable forces Cantilever cast-place construction
  • 相关文献

参考文献3

  • 1颜东煌..斜拉桥合理设计状态确定与施工控制[D].湖南大学,2001:
  • 2郭梅,吴向民.中国公路学会与结构工程学会1998年桥梁学术会议论文集.浅谈南昌新八一大桥挂篮设计与施工[A].北京:人民交通出版社,1998. 被引量:1
  • 3黄强武.桥梁施工与组织管理[M].人民交通出版社,2000. 被引量:1

同被引文献45

引证文献14

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部