期刊文献+

更换多绳摩擦提升机首绳的新方法 被引量:5

A new method to replace first rope of multi-rope friction hoist
原文传递
导出
摘要 针对目前矿井提升机首绳更换作业存在的问题,利用现有BHS型首绳快速更换设备的特有功能,提出了一种安全、快速、稳定地更换多绳摩擦提升机首绳新方法。从根本上解决了常规首绳更换工艺方法存在的施工事故多、同步性差、损坏新绳和井底收绳受限等难题,该方法具有很好的推广应用前景。 In view of issues existing during replacement of the first rope of the multi-rope friction hoists in mines, the paper studied the special features of current BHS first rope rapid replacement device, and proposed a new method to replace the first rope safely, quickly and stably. The method fundamentally solved the existing issues such as construction accidents, poor synchronization, damage of new ropes and limitation of operation in shaft bottom. It had good application prospects.
出处 《矿山机械》 北大核心 2014年第7期55-58,共4页 Mining & Processing Equipment
基金 国家国际科技合作专项资助项目(2011DFA72120)
关键词 更换首绳新方法 多绳摩擦提升机 首绳快速更换设备 new method to replace first rope multi-rope friction hoist first rope rapid replacement device
  • 相关文献

参考文献6

二级参考文献5

共引文献21

同被引文献37

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部