摘要
在青藏铁路的建设过程中 ,多年冻土是一个关键问题 ,开展物探工作时 ,会遇到较非冻结区更为复杂和多变的勘测对象 ,因此 ,选择合理的工作方法就显得尤为重要。作者论述了目前开展的各种物探方法的优劣 ,给出了利用综合物探方法勘察青藏铁路多年冻土的结果。实践证明 ,开展综合物探是勘探多年冻土的一种行之有效的方法。
During the construction of the Qinghai-Tibet Railway, the perpetually frozen ground constitutes a key problem. The geophysical exploration will meet more complex and changeable objects in the perpetually frozen ground area than in the non-frozen area. Hence, the selection of rational working methods seems to be especially important. Based on a discussion on the strong and weak points of various currently-used geophysical techniques, the author advances the idea of integrated geophysical exploration with the enumeration of some practical examples. Practice shows that the integrated geophysical exploration is an effective means in the exploration of perpetually frozen ground.
出处
《物探与化探》
CAS
CSCD
2003年第2期150-154,共5页
Geophysical and Geochemical Exploration
关键词
青藏铁路
多年冻土
综合物探技术
勘探方法
探地雷达法
Qinghai-Tibet Railway
perpetually frozen ground
integrated geophysical technique
investigation method.