摘要 简要分析了升船机上阐首基础岩体随上部建筑物施工过程的沉降变形与水平变形情况,并以部分倒垂为例,建立统计模型,对水平位移初步进行定量分析。分析结果认为,基础岩体变形合理,目前建筑物安全状态正常。 This paper briefly analyses the situations of settlement deformation and horizontal deformation of foundation rock of the upper head of TGP shiplift during the construction period. A statistical model was established by using some inverted plumb lines monitoring data, and a quantitative analysis on horizontal displacement was made by this model. The results from preliminary analysis indicate that the foundation rock deformation is rational and the major structure is in safe and normal state at present.
出处 《长江科学院院报》 CSCD 北大核心 2003年第2期57-60,64,共5页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程升船机 基础变形 数学统计模型 TGP shiplif t foundation deformation mathematic statistical model
  • 相关文献

参考文献2

  • 1河海大学.三峡水利枢纽临时船闸及升船机二期安全监测资料分析报告[R].,2002.. 被引量:2
  • 2长江水利委员会编..三峡工程地质研究[M].武汉:湖北科学技术出版社,1997:294.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部