针对秦岭隧道复杂地质情况 ,采用TBM施工方法 ,对秦岭Ⅰ线隧道出口段的TBM掘进速度与地质、设备维护及管理的关系进行了分析 ,并提出提高工时利用率的方法 ,为敞开式TBM在我国隧道工程施工中的应用积累了经验。
According to complex geological condition in Qinling tunnel which is constructed by using TBM method,based on analysis of TBM method and construction technology,the relations between progress in line Ⅰ of Qinling tunnel and geology,and between equipment maintenance and management are analyzed.The method to increase utilization of work time is proposed. Therefore experience of open TBM used in tunnel construction is accumulated in China.