秦皇岛香格里拉大酒店项目工程空调系统采用全空气系统+新风加风机盘管系统,工程技术形式先进,质量要求高,施工管控难度大。在工程施工过程中,项目管理团队精心策划,加强过程管控,积极推广并应用新技术及创新技术,优质高效地完成了工程的建设目标。通过项目部精细地技术策划及严格地过程质量管控,系统运行满足设计要求,具有推广及应用价值。
Qinhuangdao Shangri-La Hotel project adopted the air-conditioning system composed of all air system and fresh air plus fan coil system,which has advanced engineering technology,high quality requirements and big difficulties in construction management and control.During construction,the project management team effectively completed the engineering construction with high quality through meticulous planning,strengthening of process management,actively promotion and application of new technology and innovative techniques.System operation satisfied the design requirements on the basis of careful technical planning and strict process and quality management carried out by the project department,enjoying promotion and application values.
出处
《建筑技术开发》
2017年第5X期52-55,共4页
Building Technology Development
关键词
智能化
节能运行
技术策划
高效管理
intellectualization
energy-saving operation
technical planning
effective management